Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Nokia 4A0-205 Exam

Exam Name: Nokia Optical Networking Fundamentals
Exam Code: 4A0-205
Related Certification(s):
  • Nokia Optical Network Professional ONP Certifications
  • Nokia Optical Network Services Expert Certifications
Certification Provider: Nokia
Actual Exam Duration: 90 Minutes
Number of 4A0-205 practice questions in our database: 40 (updated: May. 10, 2024)
Expected 4A0-205 Exam Topics, as suggested by Nokia :
  • Topic 1: OTN hierarchy, trails, and services switching/ Network creation, analysis, and reporting
  • Topic 2: SWDM (photonic and switched) nodes/ SWDM nodes supervision on NFM-T
  • Topic 3: Basics of the Network Management System/ Introduction to WDM networks
  • Topic 4: Foundation of survivability and availability/ Basics of Optical Network Design
  • Topic 5: SWDM-based optical network management/ SWDM alarms, conditions, logs, and PMs
  • Topic 6: EPT interface and terminology/ Levels and topologies/ Network commissioning steps
Disscuss Nokia 4A0-205 Topics, Questions or Ask Anything Related

Currently there are no comments in this discussion, be the first to comment!

Free Nokia 4A0-205 Exam Actual Questions

Note: Premium Questions for 4A0-205 were last updated On May. 10, 2024 (see below)

Question #1

What is the purpose of the NFM-T node synchronization?

Reveal Solution Hide Solution
Correct Answer: B

This is done in order to keep the NFM-T database in sync with the nodes in the network. The synchronization process allows the NFM-T to keep track of any changes that are made to the nodes, such as new nodes added, nodes removed, and so on. By synchronizing the node database with the NFM-T, network administrators can ensure that their network is up to date and running efficiently.


Question #2

Is it possible to open and manage EPT designs that are created with different releases than the release installed on the local workstation?

Reveal Solution Hide Solution
Correct Answer: B

It is possible to open and manage EPT designs that are created with different releases than the release installed on the local workstation, however only designs created with current and older releases can be opened and edited. Designs created with an older release can be opened by a current release but changes cannot be made.


Question #3

Is it possible to mix PSS-24x and PSS-8x shelves In an SWDM configuration?

Reveal Solution Hide Solution
Correct Answer: B

No, it is not possible to mix PSS-24x and PSS-8x shelves in an SWDM (Short Wavelength Division Multiplexing) configuration. The two shelves are not compatible, and cannot be used within the same node.


Question #4

What is a Shared Risk Group (SRG)?

Reveal Solution Hide Solution
Correct Answer: D

According to the Nokia Optical Networking documentation, a Shared Risk Group (SRG) is defined as 'a set of network resources that share a common failure risk. When a resource in an SRG fails, the other resources in the group are also affected.' This can include fibers, boards, nodes, and other network resources. The SRG concept is used in network design and protection mechanisms to ensure survivability and minimal impact on service in case of a failure.


Question #5

Is it possible to mix PSS-24x and PSS-8x shelves In an SWDM configuration?

Reveal Solution Hide Solution
Correct Answer: B

No, it is not possible to mix PSS-24x and PSS-8x shelves in an SWDM (Short Wavelength Division Multiplexing) configuration. The two shelves are not compatible, and cannot be used within the same node.



Unlock Premium 4A0-205 Exam Questions with Advanced Practice Test Features:
  • Select Question Types you want
  • Set your Desired Pass Percentage
  • Allocate Time (Hours : Minutes)
  • Create Multiple Practice tests with Limited Questions
  • Customer Support
Get Full Access Now

Save Cancel
az-700  pass4success  az-104  200-301  200-201  cissp  350-401  350-201  350-501  350-601  350-801  350-901  az-720  az-305  pl-300  

Warning: Cannot modify header information - headers already sent by (output started at /pass.php:70) in /pass.php on line 77