Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

HP Exam HPE7-A03 Topic 1 Question 32 Discussion

Actual exam question for HP's HPE7-A03 exam
Question #: 32
Topic #: 1
[All HPE7-A03 Questions]

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client has provided floorplans. wall density, and ceiling heights tor the wireless deployment in the carpeted office space

What else will be needed to write an accurate bill of material? (Select two)

Show Suggested Answer Hide Answer
Suggested Answer: B, C

Ceiling construction details are essential for a wireless deployment because the material and structure of the ceiling can affect the propagation of wireless signals. Different materials can absorb or reflect RF signals differently, impacting coverage and signal strength. Understanding ceiling construction helps in planning the placement of access points for optimal coverage and performance. PoE (Power over Ethernet) port details are necessary to ensure that the wired network infrastructure can provide power to the access points and other PoE-enabled devices like VoIP phones and cameras. This information is critical for planning the power budget and ensuring that the network can support the power requirements of all connected devices, ensuring a stable and reliable network infrastructure.


Contribute your Thoughts:

Nobuko
10 days ago
I think flooring information is important for the accurate bill of material.
upvoted 0 times
...
Angelica
10 days ago
Ceiling construction and PoE port details, for sure. Can't forget the smart office tech either - that's gonna require some specialized gear. Oh, and don't forget the elbow grease and duct tape, just in case!
upvoted 0 times
...
Blossom
11 days ago
I feel confident that sprinkler details are not necessary for this project.
upvoted 0 times
...
Trina
12 days ago
Sprinkler details? Really? What, are we going to install Wi-Fi-enabled sprinklers now? I'm pretty sure that's not on the critical path for this project.
upvoted 0 times
...
Buffy
16 days ago
I agree with Cathrine, we also need PoE port details for the bill of material.
upvoted 0 times
...
Cathrine
22 days ago
I think we need ceiling construction details for the wireless deployment.
upvoted 0 times
...
Elizabeth
22 days ago
I'd say flooring information is also important, especially for the retail space. That could impact the wireless deployment strategy.
upvoted 0 times
...
Edna
25 days ago
Definitely need the ceiling construction details to determine the right type of access points to use. And PoE port details are crucial to ensure we have enough power for all the devices.
upvoted 0 times
...

Save Cancel
az-700  pass4success  az-104  200-301  200-201  cissp  350-401  350-201  350-501  350-601  350-801  350-901  az-720  az-305  pl-300  

Warning: Cannot modify header information - headers already sent by (output started at /pass.php:70) in /pass.php on line 77