An administrator is creating a cron job that shuts down the virtual machines at night to save on costs. Which of the following is the best way to achieve this task?
A)
B)
C)
D)
Based on the SLA requirements and the information provided in the diagram:
For the Hypervisor:
Slot A fiber channel card:
Port 1 link speed should be set to 16 Gbps since it's connected to Fabric switch A which supports 16 Gbps.
Port 2 link speed should be set to 8 Gbps because it's connected to Fabric switch B which supports up to 8 Gbps.
Slot B fiber channel card:
Port 1 link speed should be set to 16 Gbps since it's connected to Fabric switch A which supports 16 Gbps.
Port 2 link speed should be set to 8 Gbps because it's connected to Fabric switch B which supports up to 8 Gbps.
Mari
2 months agoLemuel
26 days agoLavonda
30 days agoSvetlana
1 months agoKati
2 months agoMerilyn
2 months agoTammy
2 months agoPenney
2 months agoBong
10 days agoCristy
18 days agoJaime
25 days agoCecilia
1 months agoRodrigo
2 months agoTammy
2 months ago