Independence Day Deal! Unlock 25% OFF Today – Limited-Time Offer - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Cisco Exam 300-425 Topic 5 Question 90 Discussion

Actual exam question for Cisco's 300-425 exam
Question #: 90
Topic #: 5
[All 300-425 Questions]

An engineer is implementing a wireless design for a service provider. The design includes a Catalyst 9800, a stack of two Catalyst 9300X-

48HX switches, and 9166 APs. Each AP must be named using the Floor-439412509-01X sting where X is the area number. The engineer wants

to connect the APs to the switch stack using POE. How many APs must the engineer connect to the stack so the APs run using full functionalities?

Show Suggested Answer Hide Answer
Suggested Answer: C

Contribute your Thoughts:

Rasheeda
12 months ago
I'm going with C) all ports of the switches. More ports means more flexibility, right? Plus, it'll look super impressive on the network diagram!
upvoted 0 times
...
Dominque
12 months ago
Haha, the engineer must have named the APs like they were serial numbers! B) all ports on switch 1 is the way to go, no doubt.
upvoted 0 times
Marylyn
11 months ago
Definitely, connecting all the APs to switch 1 will ensure full functionality.
upvoted 0 times
...
Fabiola
11 months ago
I agree, B) all ports on switch 1 is the correct choice.
upvoted 0 times
...
...
Felix
1 years ago
I think D) half ports per switch is the right answer. That way, the load is distributed across both switches in the stack.
upvoted 0 times
Alaine
12 months ago
It's important to have a backup plan in case one switch fails.
upvoted 0 times
...
Jillian
12 months ago
I think connecting half the APs to each switch will ensure redundancy.
upvoted 0 times
...
Christoper
12 months ago
I agree, distributing the load across both switches is a good idea.
upvoted 0 times
...
...
Hyun
1 years ago
The correct answer is B) all ports on switch 1 of the stack. The APs need POE, so they must be connected to the switch stack that can provide that power.
upvoted 0 times
Lorenza
12 months ago
B: Agreed, that way the APs will have access to POE and run with full functionalities.
upvoted 0 times
...
Buffy
12 months ago
A: Makes sense, connecting to switch 1 ensures the APs run with full functionalities.
upvoted 0 times
...
Sang
12 months ago
B: Agreed, the APs need POE so switch 1 is the right choice.
upvoted 0 times
...
Laurel
1 years ago
A: I think the engineer should connect all ports on switch 1 of the stack.
upvoted 0 times
...
Lemuel
1 years ago
A: I think the engineer should connect all ports on switch 1 of the stack.
upvoted 0 times
...
Lynelle
1 years ago
B) all ports on switch 1 of the stack
upvoted 0 times
...
Fletcher
1 years ago
A) all ports on switch 2 of the stack
upvoted 0 times
...
...
Dalene
1 years ago
I disagree, I believe the engineer should connect all ports of the switches for full functionality.
upvoted 0 times
...
Stephaine
1 years ago
I think the engineer should connect all ports on switch 1 of the stack.
upvoted 0 times
...

Save Cancel
az-700  pass4success  az-104  200-301  200-201  cissp  350-401  350-201  350-501  350-601  350-801  350-901  az-720  az-305  pl-300  

Warning: Cannot modify header information - headers already sent by (output started at /pass.php:70) in /pass.php on line 77