Independence Day Deal! Unlock 25% OFF Today – Limited-Time Offer - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Blue Prism Exam AD01 Topic 2 Question 77 Discussion

Actual exam question for Blue Prism's AD01 exam
Question #: 77
Topic #: 2
[All AD01 Questions]

Consider the following process flow from a sub-page of a process:

What is the problem with this sub-page flow?

Show Suggested Answer Hide Answer
Suggested Answer: D

Pausing a Schedule:

Pausing the schedule is the best practice for temporarily stopping a process. This maintains the schedule's configuration and simply suspends its execution for the specified period.

Maintaining Configuration:

Pausing the schedule ensures that once the period is over, the same schedule can be resumed without needing to recreate it or adjust any start/end dates. This approach is simpler and minimizes the risk of configuration errors.

Reactivation:

After the required period, the schedule can be easily unpaused to resume its normal operation.


Blue Prism documentation on scheduling and best practices for managing schedules.

Contribute your Thoughts:

Veronika
2 months ago
You know, I was just thinking the same thing. The exception stage is a must-have. It's like the emergency exit in a building - you hope you never have to use it, but it's there just in case. Better to have it and not need it than need it and not have it, am I right?
upvoted 0 times
Maurine
5 days ago
C) For better visibility of the process logic the flow steps shown in the image should be on the main page rather than in a sub-page of the process.
upvoted 0 times
...
Blythe
10 days ago
You're right, having that exception stage is like having a safety net in case something goes wrong. It's always better to be prepared.
upvoted 0 times
...
Kimbery
1 months ago
B) The sub-page process flow is missing any retry exception handling that should exist where a process calls object actions that interface with an application.
upvoted 0 times
...
Leatha
1 months ago
A) There is nothing wrong with the sub-page flow shown in this image
upvoted 0 times
...
...
Marge
2 months ago
Haha, nah man, the exception stage should definitely stay. How else are you gonna handle those pesky errors, huh? You can't just sweep 'em under the rug and pretend they don't exist. That's a recipe for disaster!
upvoted 0 times
Kristian
7 days ago
D) The exception stage within the flow should be removed and replaced with an End stage that returns the found data item as an output parameter.
upvoted 0 times
...
Patti
8 days ago
C) For better visibility of the process logic the flow steps shown in the image should be on the main page rather than in a sub-page of the process.
upvoted 0 times
...
Kayleigh
11 days ago
B) The sub-page process flow is missing any retry exception handling that should exist where a process calls object actions that interface with an application.
upvoted 0 times
...
Orville
1 months ago
A) There is nothing wrong with the sub-page flow shown in this image
upvoted 0 times
...
...
Tegan
2 months ago
I disagree, I think having the flow steps on a sub-page is perfectly fine. It keeps the main process page clean and organized. Plus, who wants to look at a cluttered mess of a process diagram, am I right?
upvoted 0 times
Martina
1 months ago
User 2: I agree, a cluttered process diagram is not helpful at all. Sub-pages can definitely help with that.
upvoted 0 times
...
Mignon
1 months ago
User 1: I think having the flow steps on a sub-page is a good idea. It keeps things organized.
upvoted 0 times
...
...
Earnestine
2 months ago
The sub-page process flow is definitely missing retry exception handling. That's a critical oversight in any process that interacts with external applications. You need to be able to handle those exceptions gracefully.
upvoted 0 times
Gwenn
1 months ago
D) The exception stage within the flow should be removed and replaced with an End stage that returns the found data item as an output parameter.
upvoted 0 times
...
Silva
1 months ago
C) For better visibility of the process logic the flow steps shown in the image should be on the main page rather than in a sub-page of the process.
upvoted 0 times
...
Lashaunda
1 months ago
B) The sub-page process flow is missing any retry exception handling that should exist where a process calls object actions that interface with an application.
upvoted 0 times
...
Francene
2 months ago
A) There is nothing wrong with the sub-page flow shown in this image
upvoted 0 times
...
...
Lettie
2 months ago
I disagree. I think the problem is with option C. The flow steps should be on the main page for better visibility.
upvoted 0 times
...
Yvonne
2 months ago
I agree with Paulina. Option B makes sense because without retry exception handling, the process flow could fail.
upvoted 0 times
...
Paulina
3 months ago
I think the problem is with option B. The sub-page process flow should have retry exception handling.
upvoted 0 times
...

Save Cancel
az-700  pass4success  az-104  200-301  200-201  cissp  350-401  350-201  350-501  350-601  350-801  350-901  az-720  az-305  pl-300  

Warning: Cannot modify header information - headers already sent by (output started at /pass.php:70) in /pass.php on line 77