[Installation Procedures]
All newly installed air-setting, hydraulic, and chemically bonded linings should be allowed to cure at the proper temperature before initial heating for a minimum of:
[Material Requirements]
Hydration is the process that causes refractory concrete to:
[Inspection and Testing Requirements]
From each production run, the testing frequency for erosion service refractory is one sample per:
[Acceptance Criteria]
Maximum allowable crack length, visible on the surface of a dense firebrick, is:
[Material Requirements]
Which of the following conditions must be met for test results from trial mixes of low cement castables to be accepted for qualification?